Water Systems and Water Treatment
Click here to see list of completed projects

NTPC's Rihand Thermal Power Station, U.P. India



NTPC's Korba Thermal Power Station, Korba, Madhya Pradesh, India


Mine Township Services Refurbishment Project, Zambia

« Pressure Filter at Konkola Water Treatment Works at Zambia

   

Rapid Sand Gravity Filters Degremont Type at Mufulira Water Treatment Works at Zambia »


Back









List of projects

 

Client / Project Package / Scope of Work

Year

Tema Oil Refinery (TOR) Ltd.
Sea Water Intake System,
Tema, Ghana
 
New Seawater Intake Pump Station & Fibre Glass Pipeline from Harbor to the Refinery Sea Water Basin 2009
AHC Mining Municipal Services Limited
Mine township Services Project,
Zambia
 
Rehabilitation of water treatment plants including old equipment like clarifiers and filters at Chililabombwe and Luanshya Water Treatment Works. 2003
AHC Mining Municipal Services Limited
Mine township Services Project,
Zambia
 
Pumping Equipment and Associated Pipe works in Mufulira. 2003
AHC Mining Municipal Services Limited
Mine township Services Project,
Zambia
 
Rehabilitation of water treatment plants including old equipment like clarifiers and filters at Kitwe, Kalulushi and Mufulira 2003
National Aluminum Company Ltd.
Industrial Drain Water Recycle System for CPP Expansion Unit 7,
Angul, Orissa
Liquid Waste Treatment Plant for treating effluents generated in the Captive Power Plant (8x120 MW) for removal of suspended solids, oil, grease etc. and achieving zero discharge by recycling total treated effluents back to the plant.
 
2002
National Thermal Power Corporation Ltd.
4 x 210 MW Kahalgaon Super Thermal Power Project, Stage - I, Units 1, 2, 3 & 4,
Bihar, India
Liquid Waste Treatment Plant including network for collection of waste water from coal settling pond, DM plant, Cooling tower blow down & PT Plant Sludge de-watering etc. and subsequent treatment using lamella clarifiers, complete with instrumentation for on-line measurement of pollutants and ensuring compliance with pollution control norms.
 
1998
National Thermal Power Corporation Ltd.
3 x 210 +3 x 500 MW Korba Super Thermal Power Plant, Stage - I & II, Units 1, 2, 3, 4, 5 & 6,
Madhya Pradesh.
Ash Water Recovery & Liquid Waste Treatment Plant comprising collection and treatment of Coal Pile Run Off Wastewater, DM Plant Regeneration Effluent, Filter Backwash Treatment, Pre-Treatment Plant backwash and Sludge Treatment and Service Waste Water. Also included was the auxiliary cooling water system inclusive of 4X 950 M3/hr cooling tower
 
1997
National Aluminum Co. Ltd.
Strip Caster Project, Smelter Plant,
Angul, Orissa
 
Systems for Twin Stream Water Filtration, Twin Stream Water Softening and related Utility Piping. 1997
National Thermal Power Corporation Ltd.
2 x 500 MW Rihand Super Thermal Power Station Stage - I, Units - 1, 2, 3 & 4,
Uttar Pradesh
 
Liquid Waste Treatment Plant including piping network for collection of waste water from coal settling pond, DM plant, Cooling Tower blow down etc.
 
1996
Bharat Heavy Electricals Limited
NHVDC Stage - I at MPEB Barsoor and Lower
Silery, Madhya Pradesh
 
15 M3/hr Water Softening Plant including systems for Cooling Tower Chemical Dosing, Chlorination System and Water Pumping & Piping. 1996
I.G. Mint
Calcutta Modernization of IG Mint
Alipur, Kolkata, West Bengal
Two Stream 5 M3/hr Water Softening System, Two Stream 3 M3/hr DM Plant and Raw Water Supply System including civil works 1995